The Sibayak area is located in the WKP Gunung Sibayak-Gunung Sinabung, North Sumatra Province, where there is 1 monoblock unit with an installed capacity of 2 MW and 2 PLTP units with a capacity of 2x5 MW. This small-scale PLTP is part of a national priority program to increase TKDN. The total installed capacity at this time is 12 MW.

12 MW
Installed Capacity

3 UNIT
Geothermal Power Plants

Gunung Sibayak & Gunung Sinabung
Geothermal Work Area (WKP)

62.400 tCO2/year
Emission reduction potential

13.300 Rumah
Electricity supply estimation

568 BOEPD
Potential savings of oil reserves