PGE started operating the Karaha Unit I PLTP commercially in 2018. This PLTP is located in WKP Karaha Cakrabuana, Tasikmalaya and Garut, West Java Province with a total installed capacity of 30 MW. The electricity production of PLTP Karaha Unit I illuminates 33 thousand houses in Tasikmalaya and its surroundings.

30 MW
Installed Capacity

1 UNIT
Geothermal Power Plant

Karaha Cakrabuana
Geothermal Work Area (WKP)

156.000 tCO2/year
Emission reduction potential

33.000 Rumah
Electricity supply estimation

1.419 BOEPD
Potential savings of oil reserves